Prefabricated Roof Tile Double Layer Roll Forming Machine

Prefabricated Roof Tile Double Layer Roll Forming Machine

prefabricated roof tile double layer roll forming machine 

Principal specialized parameter :
Metal decoiler:manual expanding,passive uncoil, interior Dia. 508mm
fat potential of decoiler:3T                       
machine stand: welded “” condition steel
variety of forming device:wallboard kind with chain transmission
diameter of shaft: ¢75
chain:16A
motor electricity of forming equipment:5.5 KW
motor of hydraulic station:3KW
forming velocity:10-15 m/min
roll station:13 stations
materials of roller: higher-grade forty five# steel
surface of roller coated with chrome .05mm thickness
type of reducing:hydraulic chopping
content of chopping blade:Cr12 mould steel
heat remedy of chopping blade:HRC58°-60°
thickness of steel coil:.3-.8mm
tolerance of length:10±2mm
transducer: Japan YASKAWA
pc adopts Panasonic PLC
personal computer operating board adopts Touch screen 
Voltage: 380V 3 section 50HZ or at buyer’s need

CZPT procedure:
Handbook decoiler→ feed with guide→ roll forming→ reducing with set length→ output with table
 

2 profile in one roll forming device
Identify Amount Units
Decoiler 1 Set
Principal Equipment Feeding gadget 1 Set
Roll forming technique one Established
Cut Equipment  one Established
CZPT system one Established
CZPT manage technique one Established
Supporter/Computerized Stacker 1 Set

We can also source the CZPT devices.


CZPT Knowledge:
1. Manual Decoiler
    Decoiler Type: Manual Decoiler
    Fat Potential Of Decoiler: 3 Ton
    Inner Diameter. Φ460-520mm
    Outer Diameter. Φ1400mm

2. Roll Forming system 
    Axis Diameter:sixty mm
    Forming Roller stand: ten-12Groups
    Major Axis content: 1st grade forty five# metal, heated and quenched
    Roller substance: 1st grade 45# steel, with difficult chrome .05mm, Quenched and heated procedure
    Travel Variety: one” Chain of transmission
    Chain materials: 45#metal, HRC45-fifty
    Equipment Frame stand: Welded structural metal
    Major motor Electricity: five.five KW  

3. Cutting Gadget (consist of 2 measurement)
    Cutting variety: CZPT cutting 
    CZPT pump station electrical power: 4 KW
    CZPT stress: 12Mpa
    CZPT Blade and cutter materials: Cr12, quenching procedure fifty eight-62
    Chopping size tolerance: 10M+/- two. mm

four. CZPTal Technique
    Voltage: 380V, 3 Phase 50Hz
    PLC CZPTal management program: PANASONIC
    Length Controller: Encoder Frequency Handle Method
    Procedure: Contact Display
    Transducer: Japan YASKAWA

5. Runout Desk:
    Non-energy type
    Amount:two

2 profile in one roll forming machine Drawing:

bundle and Guarantee:

one.Nude,with waterproof cloth and stow-wooden.CZPTed laptop handle program packed with waterproof fabric and card board.

two.This making line is taken care of cost-free of charge for eighteen months.When the device is utilized in China,we will put in and debug the equipment for freeif it is employed at overseas,we will ship the professional technician to debug.Customers need to just take all the charges for experts travelling overseas.

three.All the parts in the roll forming equipment is free to maintain all the daily life,if in 18 months our organization bear the price for exchanged the damaged component like the new elements expense and express value,if far more than eighteen thirty day period,we also totally free to maintain the broken parts but for ship the new components,the customer require bear the specific price.

4.When ship the roll forming equipment,We will also deliver one particular set CD and specification(Chinese and English) to you with the machine,they can educate you how to operater the equipment.

FAQ:
Q:What’s your Guarantee ?
twelve months, during which all elements ruined since of quality issue will be changed for free.

Q: What is actually your shipping Time ?
In 45-sixty days after obtaining pay as you go. Some machines in inventory, can be shipped at any time.

Q: What is your payment conditions ?
thirty% deposit is paid just before manufacturing, the harmony paid out following inspection affirmation ahead of shipment.

Q:What is your Set up and Training ?
If buyers arrive to our factory to examine, the education to set up and operate is supplied confront to experience.
If not, manual and video clip is provided to display how to set up and run.

Q: What is you soon after-sale service ?
We give 24-hour on the internet services for our consumers.
A.The seller will debug the equipment freely in China, and the traffic cost in China of the technique folks will be paid out by the seller.
When approach men go to the buyer’s spot to debug the devices, the purchaser should pay out the price of lodging, and visitors for the buyer’s men.
B. If the customer sends men and women to obtain the training of the operation given by the vendor, throughout the coaching interval, the seller ought to spend the expenditure of accommodation, and targeted traffic for the buyer’s gentlemen.

Q: How to place purchase ?
Inquiry—validate the profile drawings and cost—-validate the PI—arrange the deposit or L/C—then Ok

Q: How to check out our company ?
Fly to ZheJiang airport: By large pace teach From ZheJiang to HangCZPT (thirty min),then we can choose up you.

 

Prefabricated Roof Tile Double Layer Roll Forming Machine

Tags